Construction projects involve careful cost management. To measure the success of a project, understanding the cost is key. However, not all costs are the same. There are two major categories distinguishable in construction, i.e., hard costs and soft costs.
Knowing how to differentiate between these cost types makes budgeting easier, helps maintain control over element costs, and, as a sum effect, ensures the project’s profitability.
Hard costs are often called “brick and mortar” costs or those directly linked with actual construction. Such costs can be easily counted and evaluated with relatively low difficulty. On the other hand, there are the so-called “soft” or “non-brick and mortar” costs indirectly related to intangible expenses incurred during the project’s design, planning, and management.
Although soft costs might seem less important than hard costs, if not managed properly, they can affect the whole project budget. By understanding the difference between hard and soft costs, you can adequately make informed decisions and council resources, making it easier to manage construction project complexities.
Definition And Examples of Hard Costs in Construction
Hard costs depict direct costs as related to construction-related expenses. These can be seen and calculated easily. They cover building supplies, the available workforce, and necessary machinery in construction.
Examples of hard costs in construction:
- Materials: Concrete, Steel, Lumber, Bricks, Tiles, and Other Building Materials
- Labor: Wages for contractors, subcontractors, and skilled tradespeople
- Equipment: Rental or purchase of construction machinery, tools, and vehicles
- Site preparation: Excavation, demolition, grading, and site clearing.
- Utilities: Temporary power, water, and sewage connections during construction
- Permits and fees: Regulatory expenses, like building permits or inspection fees.
These hard costs usually make up a big chunk of a construction budget. They’re estimated by looking at the project specifications, how much material is needed, and what the labor rates are.
Importance of Managing Hard Costs in Construction Projects
There are several reasons why it is essential to have good management of hard costs.
- Budget adherence: The proper construction estimating software for small business and control of hard costs ensure that the project stays within the preset budget, eliminating overrun and potential monetary loss.
- Resource optimization: Proper organization and scheduling of materials, labor, and equipment avoids waste and boosts productivity, resulting in cost savings.
- Quality assurance: Investing in quality and skilled labor materials ensures the finished construction will be robust and last long. This avoids costly repairs and replacements in the future.
- Risk Mitigation: Setting up robust processes for buying supplies, managing contracts, and quality control lessen the chance of running out of materials, fights among workers, and equipment breaking down. This safeguards the project’s hard costs.
By effectively managing hard costs, you are more likely to deliver a successful construction project as planned, within budget and schedule.
Definition And Examples of Soft Costs in Construction
Sometimes, using “non-brick and mortar costs” soft costs represent the planning, design, and management activities undertaken during a construction project. Soft costs in Construction generally escape a well-defined classification and are more difficult to quantify accurately than hard costs.
Examples of construction soft costs:
- Architect and engineering costs: This covers planning, drawings, and technical specifications design costs.
- Permitting and approval fees: These are the charges for securing necessary permissions from the local government.
- Legal and advisory fees: This includes service charges for legal advice, project management consultants, and other professionals
- Insurance and Bonding: This covers liability insurance, performance bonds, and other risk protections.
- Marketing and advertising: This includes any expenditure on promoting and advertising the projects.
- Financing costs: These are costs such as interest charges, loan origination fees, and other loan-related expenses.
- Administrative and overhead costs: These are costs for things like project management, office supplies, utilities, and other administrative expenses.
Although soft costs might not seem as hefty as hard costs, they can add up. When not carefully managed, they can impact the budget and timeline of a project.
Factors Influencing Soft Costs in Construction Projects
Several factors affect just how much of an element soft costs in regards to construction projects:
- Project Complexity: More detailed Project designs with unique materials or construction in a novel way will have higher professional service soft costs associated with permitting or other approvals.
- Location: Soft costs tend to be higher in the densely populated areas of urban centers or more sensitive environmental regions due to more regulations and participation from the local community.
- Project duration: Soft costs may increase with a more extended construction schedule, as all administrative costs, financing expenses, and professional service fees are constantly accrued.
- Regulatory environment: Strict building codes, zoning regulations, and environmental laws can increase the soft costs of compliance, permits, and legal fees.
- Financing structure: The type of financing influences soft costs through interest rates and fees and any other kind of expense relation associated with the specific type of financing.
By understanding these factors, you’ll be able to better prepare and plan for possible increases in soft costs. This will lead to a more accurate project budget overall.
The Impact of Soft Costs on Construction Budgets And Timelines
Soft costs may not seem as crucial as hard costs, but they can create big problems if not handled right. They might cause a big gap in money and timelines of building projects.
- Budget overrun: If we don’t estimate these costs right or don’t keep track of them correctly, it can lead to spending more money than planned. This might shake up the entire project’s financial viability.
- Project delays: Delays are related to permitting, approvals, or professional service requirements that take up quite a bit of project time. While waiting, we might end up spending more money and facing penalties for completing late.
- Cash flow challenges: Most soft costs are incurred at the beginning of the project or during the cycle and may burden cash flow, additional financing, or contingency funding.
- Profitability erosion: There’s a chance that high soft costs can reduce the profit margin, making the project less appealing. Money spent on managing soft costs might be used elsewhere.
- Opportunity costs: These resources might be important for key parts of the project, affecting its overall efficiency and output.
Therefore, managing and reducing soft costs can boost your project’s financial health and help keep your budget and time in check. This will further increase the profit.
Strategies For Controlling And Reducing Hard Costs in Construction
These are some good strategies prescribed when controlling hard costs in a construction project:
- Detailed planning and estimation: Make sure your plans, blueprints, and materials are clear, accurate and detailed. You want to avoid unnecessary leftovers while keeping expenses precise.
- Value engineering: Consider alternative resources, construction methods, and design solutions that maintain quality while reducing costs without compromising quality or performance.
- Procurement Optimization: Take a strategic approach to supply, like bulk buying or building long-term relationships with suppliers, competitive bidding, and other means to avail the prices with better commercial terms of the entity for materials and equipment.
- Lean construction principles: To reduce waste and save money, consider just-in-time deliveries of pre-made materials and remove all the unnecessary extras.
- Technology integration: Leverage technology solutions such as BIM, cloud construction management software, and automated tracking systems for coordination improvement, resource optimization, and error and rework reduction.
- Risk management: Proactive risk management through contingency planning, insurance, and and bonds, and the active monitoring of risks related to cost overruns in general resulting from unforeseen events.
- Continuous Monitoring and Control: Hard costs should constantly be monitored and controlled throughout a project life cycle to identify any variances and take corrective measures immediately to ensure conformance to the budget.
These strategies control and reduce burdensome costs, allow the project to stay within budget, and grow profitability.
Strategies For Managing And Reducing Soft Costs in Construction
While soft costs are inherently less tangible, there are several ways you can control and lower your soft costs:
- Thorough planning: Make detailed plans considering soft costs like professional services, permits, and administrative expenses. This will help prevent budget overruns.
- Early engagement: Involve principal consultants, architects, engineers, and other key stakeholders early in the planning phase of a project. This keeps processes smooth, eliminates extra work, and reduces overall soft costs.
- Permit and approval management: Establish clear, effective, and efficient processes to secure all necessary approvals and permits. It requires early submission, complete documentation, and regular communication.
- Use technology: Introduce project management applications, document management systems, and collaboration for better coordination and decreasing administrative costs for overall efficiency.
- Negotiate professional fees: Start a bidding process and negotiate prices with architects, engineers, consultants, and other professionals to secure cost-effective rates.
- Optimize financing: Various options, such as traditional loans, bonds, and public-private partnerships, lower the cost of funding and provide better conditions.
- Continuous monitored and controlled: Predominantly monitor the soft costs on a regular basis through the project life cycle, identifying opportunities for cost savings and taking corrective action if needed.
- Management of risk: Make solid risk management plans. Consider contingency options insurance types to lessen the impact of unforeseen costs.
Such strategies will, therefore, go a long way in managing and reducing soft costs, ensuring that the project remains well within the allocated budget and ultimately yields maximum profitability.
The Role of Project Management in Balancing Hard And Soft Costs
Effective project management is the key to striking an appropriate balance between hard costs and soft costs in construction projects.
A good project manager can:
- Create in-depth detailed plans: Develop detailed project plans considering hard and/or soft costs to ensure budgeting and resource allocation are in place.
- Coordinate stakeholders: Coordinate and stimulate the collaboration and communication between architects, engineers, contractors, and regulatory authorities to streamline processes and reduce bottlenecks.
- Implement cost controls: Implement adequate cost controls, including change order management, value engineering, and constant monitoring, to ensure adherence to the budget for both hard and soft costs.
- Manage risks: Identify and mitigate potential risks that impact hard and soft costs by adopting proactive risk management strategies and contingency planning.
- Optimize Resource Allocation: The resources are used effectively to ensure the right mix of hard and soft costs through the life cycle of the projects.
- Foster transparency and accountability: Implement reporting and communication protocols for transparency and accountability within the timelines for decision-making and course corrections, as may be required from time to time.
- Use technology and best practices available: Adopt and adapt in the most simplified manner possible project management methodologies, tools, and best practices that facilitate streamlining the processes, enhancing collaboration, and optimizing cost management strategies.
Using a skilled project manager will avoid any budget balancing acts. They ensure that a project keeps its budget, maintains quality, and achieves the results desired.
Finding The Right Balance Between Hard And Soft Costs in Construction Projects
Construction projects typically work in a delicate balance between managing hard and soft costs. By understanding the differences between hard and soft costs, factors that influence them, and strategies for proper cost control and management, one is better positioned to maneuver the dynamics of a construction project.
This will be possible by embracing a holistic approach: one that includes both hard and soft cost management, coupled with robust project management practices to enable the delivery of projects within budget, on schedule, and to desired quality standards.
As a Vice President at 123worx, Construction Management Platform, Bharat Rudra has worked with hundreds of business executives searching for best-suited software for their construction business with a wide array of requirements. Bharat takes pride in helping construction businesses solve their business and project management challenges. Feel free to reach Bharat if you have any questions. You can find him on LinkedIn or reach him at brudra@123worx.com